欧美日韩国产在线播放二区_日韩ⅴ欧美ⅴ亚洲ⅴ在线播放_成人影院污在线视频_国产嫩草影院在线播放观看_chinese性旺盛老熟女_成年网站未满十八禁动漫_成人午夜av在线免费观看_亚洲中日韩欧美天堂_国产东京热无码av_超薄肉色丝袜精品足j

專業(yè)的跨境電子商務(wù)倉(cāng)儲(chǔ)物流解決方案提供商!
lisa:18682480217 shadow:17322336538 繁體中文 English

大鏟灣碼頭成為華南首家岸電全覆蓋的集裝箱碼頭

12月6日,隨著船舶岸電建設(shè)二期工程項(xiàng)目竣工驗(yàn)收會(huì)議順利召開,大鏟灣碼頭率先實(shí)現(xiàn)了100%岸電泊位覆蓋率,成為華南首家岸電全覆蓋的集裝箱碼頭大鏟灣碼頭船舶岸電建設(shè)二期工程項(xiàng)目竣工驗(yàn)收組由深圳市交通運(yùn)輸局、生態(tài)環(huán)境局、發(fā)展和改革委員會(huì)、交通運(yùn)輸局寶安管理局、生態(tài)環(huán)境局寶安管理局、寶安區(qū)發(fā)展和改革局,大鏟灣碼頭公司、設(shè)計(jì)單位、施工單位、監(jiān)理單位代表及行業(yè)資深專家代表共同組成

與會(huì)專家及代表詳細(xì)聽取、審閱了工程設(shè)計(jì)、建設(shè)、施工、監(jiān)理等方面的匯報(bào)、資料,并實(shí)地考察現(xiàn)場(chǎng)后一致同意項(xiàng)目通過竣工驗(yàn)收市交通運(yùn)輸局港航管理處處長(zhǎng)董燕澤在會(huì)上表示,深圳港是全國(guó)具備岸電設(shè)施泊位最多的港口市政府近年出臺(tái)了綠色低碳港口建設(shè)補(bǔ)貼資金管理暫行辦法等措施,大力支持深圳港船舶岸電項(xiàng)目,希望港口及各相關(guān)單位積極推動(dòng)船舶連接岸電,主動(dòng)參與綠色港口建設(shè)

The participating experts and representatives listened to and reviewed the reports and materials on engineering design, construction, construction and supervision in detail, and agreed that the project passed the completion acceptance after on-site inspection. Dongyanze, director of the port and Waterway Management Office of the Municipal Bureau of transport, said at the meeting that Shenzhen port is the port with the largest number of berths with shore power facilities in the country. The municipal government has introduced measures such as the Interim Measures for the management of subsidy funds for green and low-carbon port construction in recent years, We strongly support the Shenzhen port ship shore power project, and hope that the port and relevant units will actively promote the connection of ships to shore power and actively participate in the construction of green ports

大鏟灣岸電二期工程于2019年2月25日正式展開,并于9月底竣工及通過初步驗(yàn)收,中國(guó)船級(jí)社全程參與見證模擬帶載測(cè)試并根據(jù)測(cè)試結(jié)果發(fā)出實(shí)驗(yàn)合格證明文件

測(cè)試運(yùn)營(yíng)期間,該岸電設(shè)施成功為3艘靠港船舶提供岸電,每次持續(xù)供電時(shí)長(zhǎng)均在10小時(shí)左右測(cè)試期間所有參數(shù)均達(dá)到設(shè)計(jì)要求,全面滿足船方需求,充分反映了大鏟灣岸電系統(tǒng)的穩(wěn)定性、可靠性及安全性

During the test and operation period, the shore power facility successfully provided shore power for three berthing ships, and the duration of each continuous power supply was about 10 hours. During the test period, all parameters met the design requirements, fully met the needs of the ship, and fully reflected the stability, reliability and safety of the shore power system in Dachan Bay

轉(zhuǎn)載于:http://www.ytport.com/xwzx/jtxw/201912/t20191210_6908.html 如涉及侵權(quán),請(qǐng)直接聯(lián)系我們刪除,謝謝!